Cal Poly transition continues with groundbreaking of $100 million engineering and technology building By Savana Robinson Eight golden shovels dug into a long pile of dirt as dozens watched.
By Noah Pond Thursday, Oct. 17, the Van Duzer was packed to the gills with sweaty college students, swaying adults, and more Raiders gear than I have ever seen in Humboldt. Nearly no one sat in ...